Build Overview
A practical hardware workflow from reference files to a propeller-off validated build.
Keep propellers off while you select, assemble, inspect, and validate the hardware.
Back to the 13-step path · Next checkpoint: Airframe & Power Selection
# Recommended order
- 1
Review the reference
Inspect the EasyEDA project, v1.0 release, BOM, assembly notes, and module requirements.
- 2
Fabricate or adapt
Use the validated Gerbers or regenerate fabrication files if you changed the design.
- 3
Select the airframe and power system
Before ordering, use Airframe & Power Selection to evaluate the motors, propellers, battery, frame, and output stage as one system.
- 4
Assemble
Install PCB parts plus manual/module components such as the Wemos D1 mini and MPU-6050.
- 5
Inspect before power
Check shorts, battery polarity, connector orientation, headers, and solder joints.
- 6
Flash and validate
Program the controller, keep propellers removed, then validate IMU and motor outputs before flight.